Laserfiche WebLink
TABLE 7 <br />ROCKCASTLE COAL COMPANY <br />ORASSY CREEK MINE: POND ~ ARFA <br />• COST SUMMARY <br />DIRECT COST <br />BACKFILL 54,958 <br />TOPSOIL REPLACEMENT 55.111 <br />CONSTRUCT COLLECTION CHANNELS 5252 <br />REVEGETATION 51,852 <br />SUBTOTAL 512,173 <br />INDIRECT COST <br />PROFR AND OVERHEAD, 14 % (OSM GUIDELINES) 51,704 <br />RECLAMATION MANAGEMENT, 7 % (OSM GUIDELINES) 5852 <br />MOBILIZATION /DEMOBILIZATION - 5874 <br />SUBTOTAL 53,431 <br />TOTAL PROJECT COST 575,603 <br />• <br />J <br />