My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE109666
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE109666
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:06:42 PM
Creation date
11/24/2007 6:41:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
NH1 TAB 6 APPENDIX 6-3 CHEMICAL ANALYSIS PROCEDURES
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Determination of Total Sulfur - Continued <br />4. Turn on oxygen; set pressure at 15 psi, flow rate <br />to 0.5 liter/min. <br />5. Fill iodate buret. <br />6. Fill titrating chamber to just above oxygen inlet <br />port on side of chamber and add one measure of starch <br />solution. <br />7. Adjust to proper endpoint with endpoint controls <br />(refill iodate buret after endpoint adjustment). <br />8. Flace sample crucible on pedestal, making sure it is <br />oontered; carefully raise sample into uppermost <br />pn~iEion and close switching lever. Make certain <br />sample platform seals when closed. <br />9. Push YQd Batton on timer to start analysis. <br />10. Plate current muse reach 350-400 ma for at least 15 <br />seconds during the analysis; if not, rerun sample. <br />• 11. If buret is still changing when timer approaches zero <br />position or combustion has not taken place, set timer <br />switch to off position, orhich keeps furnace operating, <br />and maintain in this position until buret reading <br />is stable for 2 minutes. <br />12. Lower sample platform and remove crucible with tongs. <br />13. Refill iodate buret. <br />14. Return to step 6 and proceed. (Drain titration vessel <br />after every third sample, refill and adjust endpoint). <br />15. After shutdown, drain titration vessel, rinse with <br />water, refill with weak ammonium hydroxide solution, and <br />let air flow bubble through for several minutes (removes <br />precipatate buildup from titration vessel). Drain and <br />flush with water several times. Refill crith water <br />until next group of samples are analyzed. <br />Refer to Leco instruction manual for any deviation to the above <br />instructions and any maintenance of the furnance or titration <br />apparatus. <br />n <br />LJ <br />6-113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.