Air Pem~it Ac~tiamian /or rormcito Cad Compmry <br />4,000 tons maximum). Coal will be loaded into 85 ton haul trucks by an ten yard front end loader • <br />for shipment to the loadout facility. <br />At the P-1 and P-2 box cut, access from the surface to the coal seam is provided for each mine <br />individually by four portals expanding to a seven entry system underground. Portal op:nings will <br />be pre-cast concrete extending 20 feet away from the highwall face-up. A 25 foot safety bench will <br />be located above the portals at approximately 35 feet above the coal with other benched provided <br />in 50 ft. intervals. Slopes above the final bench will be cut at 2.SH:1 V. Of the four portals, two <br />will be used for ventilation with one entry equipped with a 150 horsepower exhaust fan. The other <br />two portals will be used for man supply access and coal production. There will be four portals <br />for each mine. <br />Underground mining will include room and pillar development with two continuous ((titter sections <br />per underground mine. Production will be conducted on two shifts with maintenance conducted <br />on the third shift. Production at the P-1 underground mine is estimated to be 74,5(X1 tons per <br />month when full production is reached. Production at the P-2 mine is estimated to be 70,000 tons <br />per month at full production. There will be a total of 255 production days per year. Support <br />equipment to be used underground will include a continuous miner, 48 inch production belt, <br />battery or electric shuttle cazs or continuous haulage equipment, two roof bolters, diesel powered <br />rubber tired mantrips, scoops, supply vehicles with trailers, and two shuttle vehicles. <br />Coal will be brought to the surface by 48 inch belt to a transfer station. The coal will be • <br />transferred to a 48 inch slope conveyor. The slope conveyor will discharge on to a ti0 ft. radial <br />stacker and coal pile. The coal pile at the portal will be large enough to hold approx'unately one <br />to two days production (approximately 7,500 tons maximum). Coal will be loaded into 85-ton haul <br />trucks by a ten yard front end loader for shipment to the loadout facility. <br />Mine Facilities <br />Structures <br />All support facilities associated with the surface mine will be portable and moved as the mine <br />progresses. These facilities will be limited to equipment and supply storage. No buildings or <br />structures will be constructed to support the surface mine, however, an office/change trailer will <br />be located in the surface mine area. Initial location for this trailer is shown on Figtue 2 in the <br />surface mine supply storage area. <br />Support structures located at the portal sites will include 30 by 30 foot shop and storage buildings. <br />These buildings will be of metal construction with 12 inch concrete floors reinforced with rebaz <br />and wire mesh. An office and bath house will also be located at the portals and will be 14 by 30 <br />foot trailer type buildings placed on concrete corner footers. Other facilities will include a 1,000 <br />gallon diesel fuel tank placed in a cement berm area, 10,000 gallon water tank to provide water • <br />use for underground operations, a power substation gravel pad with an eight foot chairs link fence, <br /> <br />