Laserfiche WebLink
<br />Exhibit L Reviaad 3/16/86 <br />Pit A <br />Total raa <br />Arne <br />72.67 <br />acrna <br />Lass wnt area 10.00 scras <br />Total to ba 3nndnd ~~67 scras <br />Naul Road <br />Approxiwataly tan fast along each aide to ba seeded and ^ulchsd. <br />31,425' X 20'/43360 = 5.246 acraa <br />Total Araa = S acraa <br />Total Araa to ba 3aadad <br />76.916 acraa <br />Using Colorado Dapartwant of Highways for contract <br />construction cost, the followingy yearly avers ns or landscaping related <br />contract ltnaa should approxiaatn rnclaaation costs if done on a contract <br />basis: <br />Native Sanding • 9.1 lb-PLS/acre x •9.63 = 887.63 <br />Fnrtiliznr(Availabin N) • 40 lb/acre x 8 O.AB •35.20 <br />Fnrtilixar(Availabin P) • 40 lb/ncrn x ! 0.77 •30.80 <br />Mulching (Straw) • 2 tons/ncrn x •207.70 = 8415.40 <br />Total Coat pnr Acrn = 8569.03 <br />Tran Saadlina Coat <br />Estiwatnd Coat 82.00 each <br />Average 68 trans/acre 8136.00 sera <br />Topsoil Placnaant Coats <br />Plant Sitn - 4"/12x43560/27 338 cy x 80.80 = 8430.40/acre <br />Pit Sitn - 6"/12x43560/27 = 807 cy x 80.80 8645.60/acre <br />Total Coates <br />Plant 31ta S x 81135.43 = 8 5677.15 <br />Pit Sitn G Naul Road 67.916 x 81350.63 = 891729.39 <br />Sincn no sore than one-half of the pit area will ba ainnd or disturbed <br />prior to rnclaaation work on thn other half, thn paraitnn proposes thnt <br />a raclaaation bond ba rnquirnd on th• plant ait• and one-half the dry <br />pit area awounting to 8 31,541.84. <br />