My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE109601
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE109601
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:06:39 PM
Creation date
11/24/2007 6:34:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
HAUL ROAD CONSTRUCTION SUMMARIES
Section_Exhibit Name
TAB 13 ATTACHMENT 13-10 Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To the best of my knowledge, based upon my professional expertise and to <br />• the extent possible, this haul road at the Seneca II-W Mine was <br />constructed with prudent state~f-the-art earthen construction. Further, <br />the structure was constructed in ccu[g~liance with the approved design, to <br />the extent possible, as specified in Tab 13 of the approved permit. <br />Drainage wntrol is provided by culvert and ditches and are listed in <br />Tables 1 and 2. <br />The as-built haul road location, and the horizontal and vertical alignment <br />are shown on F]dribit 13-12.4. The road width is adequate for the <br />anticipated volume of traffic. <br />Density tests were taken to ensure proper compaction on all fill areas. <br />All fill was placid in accordance with specifications found in Tab 13 of <br />the approved permit. The road structure appears to be stable, evidencing <br />no indications of cracks, deep rutting, settlement, or slope instability. <br />F7cisting side cut slopes are 1.5H:1V or flatter. Cut slope stability is <br />not a problem at this time since no existing cut slopes were steeped. The <br />• fill slopes are mostly 2H:1V and were reconstructed according to the <br />approved abatement plan for NOV C-90-018. <br />The as-built drawings will replace the design drawings. <br />To the best of my knowledge aryl belief, field adjustments made during the <br />construction of the structure are in conformance with the Rules and <br />Regulations and the intent of the approved designed plans and <br />specifications as approved by the Colorado Mined Land Reclamation <br />Division. <br />SEP 1 ~ lyyl <br />Date <br /> <br />Revised 09/13/91 <br />~~~~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.