Laserfiche WebLink
-5- <br />Math ud EcbNlts: <br />Two(2)compkue,inboundapplicationpamustbesubmitted Oneoompleleapplicationpackageconsistsofasignodapplicati~nfa~m <br />and the set of maps anderddbits referenced below as Exhibits A•S, Addendum 1, and the Geotcehoical StabilityFad,ibit. Eacltexhibitwithmrhe <br />applicatim must be presented as a separate section. Begin each ex6ibil on a new page. Pages should be numbered aonseculively for ease of <br />referertoe. [f sepaate doctmtents me used as appendices, please reference these by name in the exhibit. <br />With each of the two (2) signed application foruts, you must submit a oorrespording set of the maps and exhibits as described in tlx following <br />refaettces to Ride 6.4, 6.5, attd 1.6.2(1 xb): <br />EXHIBCf A Legal Description <br />EXHBIT B Index Map <br />E)tl-SIT C Pre-Mining and Mining Plan Map(s) of AB'ected I.e~.9 <br />EXkffBITD Mining Plan <br />EXHIBIT E Reclarnati~ Plan <br />EXHBIT F Reclamation Plan Map <br />EXH®[T G Water Iafamation <br />EXHIBIT H Wildlife I~'ormation <br />EXHIBIT I Soils Irdonnstion <br />EXH®IT d Vegdatron heformation <br />EXHBIT K Climate Information <br />EXHIBIT L Rxlamatiw Costs <br />EXHIBIT M Other Pervtits and Licenses <br />EXHffiff N Source of Legal Right-To-Enter <br />EXHIBIT O Owners of Record of Affected Land (Surface Area) and Owners of Substance b be Mined <br />EXHIBIT P Municipalities Within Two Mies <br />EXHBIT Q Proof of Mailing of Notices to Corany Commissioners end Catservaliov District <br />EXHBIT R Proof of Filing with County Clerk or Recorder <br />EXHIBITS Permarcnt Man-Made Stnrdurcs <br />Rule 1.6.2(1x6) ADDEND(JM I -Notice Requirements (saznple enclosed) <br />Rule 6.5 Geotxhaical Stability Exhibit (any required sectiars) <br />The insuuctions for prepming Exhibits A-S, Addendum I, end Geotechnical Stability Exhibit are specifced under Ruk 6.4 and 6.5 and <br />Rule 1.6.2(1)(6) of the Rules end Regulations. If you have any question on preparing the Exhibits er content of the information required, or <br />would like tD sclreduk apre-application ntoeting yet may contact the Office at 303-gGG-3567. <br />Resoortsibilities as a Permittee: <br />Upon application approval and permit issuance, this application berotnes a legally binding document. Therefore, these are a <br />ntttttber of important requirerttents which yoq as a pem»ttoe, should fully understand These requirertrents are listed below. <br />Please read and mi[ial eacb requirement, m the space provided, to aclrnowledge that yet understand yottr obligations. Ifyw do tttx <br />understand these obligations then please cattact this O[Cice far a Cull explattatim. <br />~(yj~{~ 1. Your obligation to reclaim the site is trot limited to the amount of the financial warrattty. You assturte legal <br />liability for alI rt~nable expenses which the Hoard or the Office may incur to reclaim the affocted -azeds associated <br />with your mining operation in the evera your permit is revoked and fittmtcial watrmry is forfeited; <br />