Laserfiche WebLink
Following is an estimate of reclamation costs. Bear in mind that this estimate is based on today's cost and <br />is subject to inflation and economic fluctuations. Changes and revisions as a result of the review process <br />to the accompanying recamation plan may also affect the total cost. <br />20 ROAD GRAVEL PIT <br />Equipment: Dozer S Scraper Avg. Push Grade: 17°b Avg. Push Distance: 3~ <br />Avg. Haul Grade: ~ Avg. Haul Distance: ~~ <br />ITEM DESCRIPTION UNIT IlUAN. UNIT <br />PRICE TOTAL <br />1 Mobilization <45 mi. EA 4 $ 1,000.00 $ 4,000.00 <br />2 6" -Class 6 ABC Ton 7,370 14.00 103,180.00 <br />3 Embankment CY 103,476 $ 2.00 206,952.00 <br />4 Place lop Soil CY 5,650 $ 1.50 8,475.00 <br />5 Seed, Mulch, and Tack Fertilize <br />Side Slo es AC 7.0 300.00 2,100.00 <br />6 "Biosol" Fertilizer AC 7.0 385.00 2,695.00 <br /> Subtotal $327,402.00 <br />7 Indirect Costs LS 19,500.00 <br /> Subtotal 346,952.00 <br />8 Project Management LS 13,000.00 <br /> TOTAL $359,952.00 <br />NOTE: <br />APPROXIMATELY 30,000 TONS OF CONCRETE RUBBLE IS INCLUDED WITHIN ITEM 2. HAUL AND PUSH DISTANCES FOR <br />RUBBLE ARE INDICATED ABOVE. <br />