Laserfiche WebLink
• During the summer of 2006, Bowie Resources Limited submitted an application <br />for technical revision (TR-43) to create a new borrow area. By creating a new <br />borrow area, the Probably Hydrologic Consequences (PHC) for the Gob Pile <br />Sediment Pond (also known as Pond D) changed. <br />• <br />r1 <br />~L J <br />The contributing Drainage Areas now have a "D"designation (ex. D-D1 or C-D1). <br />The PHC for new pond D is located in Volume III, pages Exh. 8-17 through 19, <br />the SEDCAD output is now located in Volume III, pages 207 & 208. The upland <br />runoff areas are shown on Map 20 in Volume II. <br />TR-43 <br />/j P~RovED <br />9 ~li/n6 <br />Volume IV - 13i <br />os~os <br />