Laserfiche WebLink
I)14. I ISII CRI?FK VLN'fILA"PION 130KEHOLG - 'I'fCHNICAL RI'sVISION N89-III (conlinucd~ <br />• <br />ti ccd i n, <br />GO \ 20 <br />i0 X I.00 <br />6,200 ft= <br />$219.00/ac X . I ac <br />total Costs <br />Quilding Removal <br />Concrete Pad Removal <br />Raad Removal <br />Seal Casim, <br />Topsoil Replacement <br />Seeding <br />Sav <br />= I?OU fi= <br />_ x,000 ft= <br />= 0.1 ac <br />_ $31.90 <br />$23.00 <br />_ $ 141.on <br />_ $ 42.00 <br />_ $ IiS.00 <br />_ $ 100.00 <br />_ $ 196.00 <br />$ ~~.00 <br />Subtotal = $ 639.00 <br />10%Admin Fee = $ 63.90 <br />Total = $ 702.90 <br />Say = $ 700.00 <br />C~ <br />• <br />MR97 154 <br />14(a) <br />10/2/97 <br />