Laserfiche WebLink
D12. t)hhlCli'1'RAILIR #3 - MINOR 121V1S1ON 89-25 <br />• <br />\. I r,iilu Runuvol <br />Asaimpliuns(Sce VIII Q, Quilding Removal p,. 2.0~-~2) <br />total Labor and L'quipmcn[ Ra[e <br />I-slimated Hourly Pro[luction <br />l railer - 361t. X 56 ft. X I ~ ft. <br />1,120 y[I3/65.25 yd3 per boor X $202/hr <br />13. I.uuipmrnt Removal <br />a) "fransfonner <br />Approximate size 2' X I.5" X 2' <br />Remove from pad and place on trailer I hr X $202/hr <br />h) Pad Removal <br />Approximate size 4' X 3' X 2.5' <br />Runoval cost = $ 3.70 yd3: I yd3 X $3.70 yd3 <br />_ $?I12 per hour <br />= 6~?5 yd'' per h~ <br />= I,I20vd3 <br />_ $3,467?8 <br />_ $ 2(12.00 <br />= I vd3 <br />_ $ 3.70 <br />total Tr;iiler, Equipment and Pad Removal = $3,672.98 <br />10% Overhead = $ 367.30 <br />Total = $4,04023 <br />Sav = $4.040.00 <br />• <br />• <br />M R 97- I ~4 <br />12 <br />10/2/97 <br />