Laserfiche WebLink
U4. Addiliuual han/Substation Modification Bond Gdculatimt -Minor Kcvision 87-117 and S7 118 <br />• (continued) <br />I) Switch year <br />approsima[e size 7' X ~' X I I' <br />remove from pad and place on wailer <br />I hr X $202/hr = $202.Ot1 <br />I'ad removal <br />) st had approximate size ~6' X I5' <br />outer perimeter - 0.5' wide and I.5' thick <br />interior pad - 0.75' thick <br />outer perimeter of pad 112' X S' X I.S~ = 3.1 C}' <br />interior pad - ~S.S X 14.5' X .75~ = 22.d C~, <br />Total = 2?.~ CY <br />2nd pad approximate size 17' X 9' <br />outer perimeter - 0.~' wide and I S' thick <br />interior pad - 0.75' thick <br />outer perimeter - ~2' X .5' X I.5' = I .4 C}' <br />interior pad - IG.~' X 8.S X .7~' = 3.9 C'}' <br />Total = ~.3 (~;) CY <br />Removal cost $3.70/CY <br />31 CY X $3.70/CV = $ 114.711 <br />h) Pole Removal <br />• 9 poles at $IS/pole $ 13~ 00 <br />i) Total Substation Removal and Disposal - $7190.00 <br />SUMMARY <br />Fan & Motor = $ R84 00 <br />Substation = $2, 190.00 <br />Subtotal = $3.074 00 <br />10% Overhead = $ 311700 <br />Total = $3.'81.00 <br /> <br /> <br />M R 97- 154 4(a) 10/2/97 <br />