Laserfiche WebLink
I)2. Ucrcluumcnl Urillim~ Ncclam:uiun - MR 37-U5 <br />Mohilvaiiun of cyuipmcnt <br />Kechuuatiun of L drill holes averaging approximately 1400 feet in depth; <br />54(10 Feet total length of hole to be plugged with cement <br />Fluid, Gyuipment Time - 8 how's per hole, <br />ti holes at $9.00 per hour <br />Cement slurry, 1300 It. per hale, 10 yd <br />Murry per hole, $840/hale. 6 holes <br />Nun-;lip "Octo" plug set at 10 ft.-one <br />per hole. C holes, $I.00 per plug <br />I:cgrading V drill sites, each 1000 square feet: <br />Gquipmenc Dozer - I hr. per pole, 6 holes- <br />. at $50.00 per hr. <br />tieeding 0.14 acres- at $128.00 per acre <br />Total <br />• <br />n <br />U <br />_ $ 10.(10 <br />_ $4.5(,0.00 <br />_ $s.u4o.oo <br />_ $ G.00 <br />_ $ 300.00 <br />_ $ 18.00 <br />_ $9.974.00 <br />MR 97-154 2 10/2/97 <br />