Laserfiche WebLink
Excavation for the pipeline in this area will not be allowed to exceed 50 feet a[ any time. <br />If slope movement appears during the construction, the area will be backfilled <br />immediately and surface movement mirrors will be installed to monitor rate of <br />movement. A contingency plan will be developed to complete the project in this area <br />prior to any construction. This plan will be given both to the USFS and CDMG for <br />approval. <br />SECTION 8.0 RECLAMATION <br /> <br />The proposed reseeding mixture for the roadway is shown in Appendix H of this report. <br />This seed mix will also be utilized for final reclamation of the roadway. A typical detail <br />of the final roadway reclamation is shown in Sheet 15 of 15 of the detail sheets in <br />Appendix A. <br />• <br />C~ <br />