Laserfiche WebLink
1 <br />EXHIBIT L <br />HINDS Pit #35: <br />Reclamation Costs <br />Estimated costs to reclaim the mining site: <br />EQUIPMENT $/HR HOURS <br />Backfilling: <br />1 Loader 60 12 <br />1 Dozer 60 12 <br />2 Men 12.67 12 <br />3 Trucks 35 12 <br />3 Men 12.67 12 <br />Topsoil Application: <br />1 Loader 60 10 <br />1 Man 12.67 10 <br />Seeding: <br />1 Tractor/Grass drill 25 4 <br />1 Man 12.67 4 <br />Mulching: <br />2 Trucks 35 ] 0 <br />1 Loader 60 10 <br />3 Men 12.67 10 <br />Moving Equipment from Pritchett: <br />1 Semi/lowboy trailer 35 2.5 <br />1 Man 12.67 2.5 <br />1 Loader to site 60 .25 <br />1 Dozer to site 60 .25 <br />1 Loader to topsoil s ite 60 1.5 <br />Grass Seed <br />Total: <br />+15.8% <br />Grand Total <br />No temporary seeding will be done. <br />Topsoil will be stockpiled for reclaiming purposes. <br />Slopes will be 3:1 and reseeded to native grass. <br />TOTAL $ <br />720.00 <br />720.00 <br />304.08 <br />1,260.00 <br />456.12 <br />600.00 <br />126.70 <br />100.00 <br />50.68 <br />700.00 <br />600.00 <br />380.10 <br />87.50 <br />31.68 <br />15.00 <br />15.00 <br />90.00 <br />250.00 <br />6,506, 86 <br />1,028.08 <br />7,534,94 <br /> <br />