Laserfiche WebLink
3- <br />detemrirred: <br />b) The Board wil[ eater the lands to perform reclamation only if the Board has <br />i. that reclamation required by law to have been performed upon such lands has <br />not been performed, and <br />ii. that financial warrurty forfeiture proceedings described in the Ad or similar <br />provisiarrs of subsequent laws, if any, have beat initiated. <br />c) The Division, ailing for the Board, will errter lands to respond to an emergency Drily <br />where the Division daerrnines that any of the conditions of Construction Material Rule 8.4.2. exist. <br />'17 The additional conditions set forth in the attadred rider, if any, are incorporated herein by <br />referarce. <br />/_1 a) Rider is attached. <br />/ XX / b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DE"PART~MENT OF NATURAL RESOURCES <br />RONALD W. CATTANY <br />Acting Division Director <br />