Laserfiche WebLink
<br /> <br />• It is obvious that the e::cavatian period for- this clay body <br />makes these estimates ,lust that. The operator cannot project <br />b~.rsiness demand for this period as stated in (e): An Op- <br />erator shall not 6e required to meet specific dates for <br />initiation or- cr_~mpletion of mining a phase as may be identi- <br />fied in the timetable. <br />(ii) Desn-iptinn of sire and locaticm to be wcn-ked dur-ing <br />each nhasa_ <br />See Mining Flan and Timetable Map - E>:hi6it "C" <br />(iii.> Outline the sequence in which each stage or pYrase of <br />the operation will be carried out. <br />See Mining Flan and Timetable Map - E;:hibit "C" <br />Mininy of the affected area will proceed from nor-th to south <br />as described earlier} with overburden and topsoil stockpiles <br />placed to visually shield the operations as much as possible <br />from public view. <br />(f). Narrative infc,rmatien in conjunction with maps in <br />(.i) Nature~_depth acrd thickness of the deposit. and <br />thi.c4;ness of over-burden to be removed: <br />The c_lav deposit ranges in depth from 10' - 30'. Overburden <br />varies from 4' - 3tr'. Overburden consists of Presser sandy <br />loam and Presser - Tr-uc4:ton sandy loam soils. <br />(i~i) N_atur-e of tFre stratum immediately beneath the <br />mater-ia1. to be mined: <br />The stratum immediately beneath the clay body is c:l.ay} sand <br />and/or shale. <br /> <br />D- 3 <br />