Laserfiche WebLink
r~ <br /> <br /> <br />EXHIPIT "D" <br />MINING FLAN <br />This operation will be somewhat similar to other clay pits in <br />Elbert grid E1 F'asa County. Preliminary testing indicates a <br />clay depth of 1U' - 30' and crverburden varying from 4' - 3U'. <br />The Eresser sandy loam and Bresser - Truck tan sandy loam have <br />apps;;imately '7" of topsail according to the SCS =_;oil survey. <br />(a). Mining Methods: <br />Extraction will begin on the north and move progressively <br />south. An area of sufficient size to captain both tF;e ex- <br />traction process and product and product stoc4:piles will be <br />- topsail and overburden will be stac4::piled along <br />perimeter r~a~-in--scrtlFl-a way as to <br />reen the e;:traction area from public view, <br />venting stormwater r;_;naff from traversiny the <br />As e:;traction progresses south <br />topsail and overburden being <br />bac4:fi11, slope anti re-topsail <br />interim stocF::piling. When al <br />opening up a <br />removed will <br />the e>;tracted <br />area, the <br />used to <br />without <br />y~~overbui-pen will be replacetl. The clay wil~be stoc~iT~7-by <br />scrapers, bat:: oes, ron -end loaders and/or' bulldozers with <br />~~ rippers, but not limited to any of these. <br />Earthmoving: <br />(c). Water diversion and impoundments: <br />1. There will 6e no irnpaundmenl:s other Chap the pit it- <br />self. The onl diversion w' 1 be low berms and/or diversion <br />~~/ ditches to prevent starmwater runo thra~ t e ac a pit <br />~~~ area. <br />~ ~~ '.,~' <br />~~ a ~s ~- <br />b-` <br />~~ <br />D-1 <br />as well as pre- <br />pit area. <br />Earthmaving will be performed by any combination of front-end <br />loaders, dozers with rippers and/cn- sn-apers. <br />