My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE109248
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE109248
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:01:56 PM
Creation date
11/24/2007 6:00:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
7/3/2007
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate TR45
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # : 181 <br />Date : 02252007 <br />User: JRS <br />Agenq or organization name :Colorado Division O/Minerals And Geology <br />Permit or other job action :Technical Revision 45 <br />Task description :Spread Uncompacted Refuse at Gob PJte tR? <br />Basic machine :Cat D9R - 9SU Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cosUhour : $58.94 NA <br />Operating cost/hour : $104.98 100 <br />Ripper op.costlhour : $9.97 100 <br />Operator cosUhour : $32.53 NA <br />Total unit cosVhour : $204.43 Total fleet costlhour : 5204.43 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 200,000 LCY factor: NA volume: 200,000 LCY <br /> <br />Source of estimated volume :Volume Xl, Page 1 <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Co rtection Factors Source <br />Average push distance : 150 feet <br />Unadjusted hourty production : 910.5 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 0.00 % (I <br />Average site attitude : 5, 900 feet <br />Material weight : 2,100 Ibs/LCY <br />Weight description <br />Shale <br />Operator skill : 0.75 (avg.) <br />Material consistenq : 1.20 (Cat HBJ <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job effldenq : 0.83 (1shiR/dal <br />Spoil pile : 0.80 (fnd-rn <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weigh : 1.10 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net cortection : 0.65 <br />Adjusted unit production : 595.72 LCY/hr <br />Adjusted fleet production : 595.72 LCY/hr <br />JOB 71ME AND COST <br />Fleet size : 1 Dozers) Total job time : 335.73 Hours <br />Unit cost : $0.343 /LCY Total job cost : $88,632 <br />State :Colorado <br />County :Delta <br />Site :Bowie No. 2 Mine <br />Pertnitlob# : G98-083 <br />Abbreviation :none <br />Filename : C083-181 <br />
The URL can be used to link to this page
Your browser does not support the video tag.