Laserfiche WebLink
-3- • <br />• <br />G,l:`IIBIT C?1a~ <br />T.'~is r..~p should clearly define the parrot bcun da r'es and contain sufficient information <br />to deter;aiae the location of t7;e affected !and on the ground and existing and proposed <br />roads or access routes to b<~ used in connection with the msning operation. All <br />i,~~di.;tely adjacent l..nr.'oi,~ners of record must be s o~,~n. The uuarter section corner, <br />ser_tion line, of any other Locatable points should also be shec~m on this .,ap. <br />£l.H737T D - f9ildli fe, :dater Resources, Y'e cetati on and soils Information <br />Each of the above-mentioned subjects must be addressed as outlined in the applicable <br />2ULE. <br />P _YI3iT E - F.e c_'a.;a ti on ?Ian <br />As with the mining p1 an, this should be a general discussion of the methods, equiprent, <br />phases or stages of the reclamation process and those portions of land affected by each. <br />If possible, the plan should be closely correlated with the map. If not, the narrative <br />must be comprehensive enough to draw an accurate verbal picture of the expected appear- <br />ance of the area after completion of reclamation. <br />EXFfIBIT F - Proof of Compliance with Local Government Zoning <br />In accordance with 34-32-215(4)(e), the Board must make a finding that the operation <br />will be in compliance with local zoning or subdivision regulations. You are noC <br />required to submit this information, but a submission would assist the nivision's pro- <br />cessing of the application. When the Division notifies the Zoca1 government of the <br />existence of this application, it will request information regarding compliance with <br />applicable local law. It is intended that operators may concurrently come into compIi- <br />ance with Local requirements at the same time the Division is processing this applica- <br />tion. Information regarding the status with local government will be heIpfuI. <br />EX7fIBIT G - Source of Legal Right to Enter <br />This could be a copy of the lease, deed, abstract of title, or current tax receipt. <br />An acceptable alternative would be a statement acknowledged by a notary public that the <br />operator has the legal right to enter and mine, <br />EXHIBIT H - Reclamation Costs <br />Fora I10 permit, if the operator requests financial warranty to be Zess than 55,000.00, <br />the operator must submit facts to support such a request. Otherwise, a financial war ran g <br />of 55,000.00 wi1Z automatically be set. Fot all lI1 permits, the financial warranty shat: <br />be 52,500.00 per acre. <br />EXHIBIT Z - Terms of Governrmntal Contracts (111 Applications only) <br />For Special '10-Day (111) permits, the operator must submit a copy of the contract or <br />other proof that proves the necessity of a special 10-day permit. The operator must also <br />submit evidence of the financial warranty provided under the governmental contract, if <br />it was required. <br /> <br />