My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE109242
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE109242
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:01:55 PM
Creation date
11/24/2007 6:00:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983119
IBM Index Class Name
Permit File
Doc Date
7/1/1983
Doc Name
LIMITED IMPACT 110 AND SPECIAL TEN DAY 111 PERMIT APPLICATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i~ .Y . • • <br />~ ~..5 EXHIBIT E <br />~ _J ACCLAMATION PLAN <br />Landscape Design <br />• After mining is complete, the area will be shaped and <br />graded. Where possible, final grading should be done on the <br />contour to conserve moisture and reduce erosion. Slopes should <br />be cut or filled so that no slope .is greater than 3:1. Seeding <br />success will increase if lesser slopes remain. The land will be <br />scarified to a depth of six inches following grading to provide <br />better cohersion be tweed topsoil and the .graded area. <br />Top::oil <br />Topsoil will be stockpiled prior to mining. After grading <br />is completed, topsoil will be spead over the area as evenly as <br />possible. <br />Fertilizer <br />A soil test should be made to determine the proper amounts <br />of fertilizer to apply. Fertilizer should be applied immediately <br />prior to :seeding, at the time of seeding, or immediately following <br />seeding, as applicable to the kind of fertilizer and type of <br />equipment used. <br />Seeding <br />Seedir~ will be clone shortly after the topsoil is applied <br />to prevent excess weed growth and loss of soil by erosion. Seed <br />will be planted with a drill designed to plant grass seed. The <br />area will be seeded sometime between the 1st of November and <br />May 31st. <br />See attached CO-ECS-S for seeding recommendations. <br /> <br /> <br /> <br />'! M <br />
The URL can be used to link to this page
Your browser does not support the video tag.