Laserfiche WebLink
<br />LIST OF TABLES <br />• <br /> <br />TABLE <br />NUMBERS <br />2.1-15 Equipment List <br />2.2-15 Construction and Disturbance Timing <br />2.3-15 Water Consumption <br />3.1-15 Reclamation Cost Calculations <br />3.1-25 Reclamation Timetable <br />3.4-15 Revegetation Seed Mix <br />4.2-15 Design Discharges for Coal Refuse Area Watershed <br />4.2-25 Surface and Groundwater Quality Monitoring <br />4.2-35 Summary of Monitoring Wells Installation & Testing <br />4.2-45 Groundwater Rights and Springs <br />4.2-SS Surface Water Rights - W.D. 72, Division 5 East Salt Creek <br />4.2-65 Mean Monthly Discharges, East Salt Creek Near Mack <br />4.2-75 Estimated Monthly Discharges, East Salt Creek near <br />Central Facilities Site <br />4.2-SS Design Discharges for Several Areas Within the <br />East Salt Creek Watershed <br />4.2-95 Discharge Measurements <br />4.4-15 Soil Series Characteristics <br />4.9-25 Soil Map-Unit Characteristics <br />4.4-35 Criteria for Evaluation of Topsoil Suitability <br />9.4-45 Laboratory Analyses for Major Soils <br />4.4-55 Evaluation of Topsoil Suitability by Typical Soil Pedon <br />1/17/86 <br />