Laserfiche WebLink
• <br /> <br /> <br /> <br />2.2-11.25 Fresh Water Ponds <br />2.3-2.25 Munger Creek Relocation <br />2.3-2.35 Munger Creek Relocation <br />2.5-15 Topsoil Stockpile Detail <br />3.1-15 Reclamation Plan Map <br />4.1-15 Preliminary Alluvial Valley Floor Identification <br />4.2-15 Loma Project Location Map <br />9.2-25 Groundwater Table Map <br />4.2-2.15 Monitoring Program <br />4.2-35 Geologic Cross Section A-A <br />4.2-45 Geologic Cross Section B-B <br />4.2-55 Typical Construction of Monitoring We11 <br />4.3-15 Drainage Areas <br />4.3-25 Mean Monthly Discharge as Percentage of Average Annual <br />Flow for East Salt Creek Near Mack, <br />July 1973 - September 1980 <br />1/17/86 <br />