Laserfiche WebLink
--. <br />• <br /> <br /> <br /> <br />it {; <br /> <br /> <br />ut ~ Table <br />Reclamation <br /> <br />Backfilled V-3 <br />Timetable - Continued <br />Source of <br />Fill Material Topsoiled <br /> <br />Source of <br />Topsoil <br /> <br />Mulched <br />& Seeded <br />4 1 3/83 Cut 2 4/83 TS {IS Spring 83 <br />4 2 4/83 Cut 3 5/84 TS 118 Spring 83 <br />4 3 5/83 Cut 4 6/83 TS 118 Fall 83 <br />4 4 6/83 Cut 5 7/83 TS 118 Fall 83 <br />4 5 7/83 Cut 6 8/83 TS {18 Fall 83 <br />4 6 8/83 Cut 7 9/83 TS 118 Fall 83 <br />4 7 9/83 Cut 8 10/83 TS ~8 Fall 83 <br />4 8 10/83 Cut 9 ~ 11/83 TS 118 Fall 83 <br />4 9 11/83 Cut 10 12/83 TS 118 Spring 84 <br />4 10 12/83 Cut 11 1/84 TS p8 Spring 84 <br />4 11 1/84 Cut 12 2/84 TS 08 Spring 84 <br />4 12 2/84 Cut 13 3/84 TS 118 Spring 84 <br />4 13 3/84 Cut 14 4/84 TS p8 Spring 84 <br /> <br />