My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE109161
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE109161
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:01:46 PM
Creation date
11/24/2007 5:55:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
V. MINE PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.3 OPERATION PLAN - PERMIT AREA (2.05.3) <br />The previous section classified the mine as a contour mine and <br />the mining method as the haulback technique. The anticipated production <br />was put forth in Table V-1 and the reader is referred to the preceding <br />section for the mining description. <br />5.3.1 Production Methods and t+r;„ipment <br />The mining of both the Cass and Del Pgua Seam, will be <br />done by the haulback method along the contour. As stated above, <br />to initiate the mining sequence a box cut is made and the material <br />fr<an this cut is stockpiled and then used to backfill the last <br />cut. Rice the box cut is excavated and the coal removed the <br />material fmn the next cut is placed in the box cat. This <br />• successive excavation and backfilling ~ntinues until the last <br />cut is made and the coal is removed. The cut is then backfilled <br />with the material from the box cut. The specific overburden <br />handling plan will be presented in a following section. <br />After the coal has been removed from the cut an auger is <br />brought up to the base of the highwall and the augering operation <br />is initiated. TBM uses a twin bit auger with 27 inch diameter <br />bits in the augering operation. Because of the thickness of the <br />Del Agua Seam the seam is bored twice, with one bore on top and <br />the other bore belva. 'ihe typical augering pattern is shozan on <br />Drawing V-9. The mini,m,m rib thickness will be six inches. AS <br />the gal is extracted it is wnveyed to a stockpile area and then <br />. loaded into the haul trucks for transport to the coal storage <br />V-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.