The backfilling operation utilizes the front end loader and the <br />haul trucks. The basic format is for the front end loader to excavate <br />the overburden and load it into the haul truck which then transports it <br />to either the overburden stockpile or to a worked out cut. his basic <br />cycle is continued antil all the overburden and opal is removed from a <br />particular cut. <br />In order to maximize resource reoovasy the exposed coal seam will <br />be augered before the cut is backfilled. The auger is simply positioned <br />at the base of the highwall and the opal is then augered to a depth of <br />approximately 150-200 feet. A thorough discussion of the augering operation <br />will be presented in a following section. <br />The annual production is anticipated to be 240,000 tons unless <br />market conditions warrant a change in total production. If this pro- <br />duction is realized the monthly production will be 20,000 tons. Depending <br />on market conditions, 1,200,000 tans of gal would be mined over the next <br />five years. <br />The P1ine Plan Nlap (Map V-2) presents the mine layout and the amount <br />of disturbance which will occur during the current permit term. 'IY~e <br />disturbance information presented on hlsp V-2 is tabulated in Table V-1 <br />with this table indicating the number of acres to be disturbed per cut, <br />amount of overburden to be removed per cut, airount of gal to be removed <br />per cut, and total wlume of cut. <br />'I1~e specifics of the operation will be Wore thoroughly presented <br />in the following section. <br />• <br />V-3 <br />