Laserfiche WebLink
• 2.05.4 <br />2. This is addressed on page VII-15 in the first paragraph <br />which states that backfilling and grading will occur within <br />60 days and that backfilling will not exceed coal removal <br />by more than 1500 feet. <br />Further reference is made to Tables V-1 and V-3 which <br />show the time sequence between excavating and backfilling <br />each cut area and Map V-2 which shows the location and size <br />of each cut area. <br />~• <br /> <br />