Laserfiche WebLink
<br />sI L v. MII~-PLAN- <br />III IIIIIIIIIIIIIIII <br />999 <br />Doc Date:12/1112001 <br />TABLE OF CONTENTS <br />~' <br />Section P-act <br /> <br />5.1 HISTURY AND DESCRIPTION (2.05.1) V-1-V-2 <br />5.2 MINE PLAN -LIFE OF THE OPERATION (2.05.2) V-2-V-4 <br />5.3 OPERATION PLAN -PERMIT AREA (2.05.3). V-5-V-20 <br /> 5.3.1 Production I~thods and Fk~upment. V-5-V-6 <br /> 5.3.2 Operation Description V-6-V-18 <br /> 5.3.2.1 Staking of Area V-6-V-8 <br /> 5.3.2.2 CorLStruction of Sediment Control Syst~n V-8-V-9 <br /> 5.3.2.3 Wnstruction of Haulroads V-9 <br /> Grubbing of woody Vegetation. <br />11 V-9-V-10 <br /> 5.3 <br />.2.5 Tbpsoil Salvage V--10-V-11 <br /> 5.3.2.6 Overburden E~n[nval, Coal Removal, Overburden <br /> I~placement V-11-V-16 <br /> 5.3.2.7 Topsoil Raplacelnent V-16-V-17 <br /> 5.3.2.8 Reclamation Pctivities. V-17 <br /> 5.3.2.9 Coal Handling Structures. V-18 <br /> 5.3.3 Mine Facilities V-19-V-20 <br /> 5.3.4 Ponds, Impoundments, Diversions V-20 <br />5.4 RECLAMATION PLAN V-21-V-26 <br />5.5 POST MINING LAND USE V-27-V-29 <br />5.6 MITIGATION OF SURFACE COAL MINTSIG OPERATION IMPACTS. V-30-V-34 <br /> 5.6.1 Air Ibllution Control Plan. V-30 <br />P <br />~, <br />