Laserfiche WebLink
has performed any engineering studies or had any questions regazding our position, they <br />At this time, Kaneb must continue to reiterate that we have no objection to the proposed <br />mining operations provided we can reach agreement-with Coulson regazding the safety <br />and protection of our high-pressure petroleum pipeline, and preserving Kaneb's rights <br />gianted by the original right-of-way grant. This right includes the right to inspect, <br />operate, maintain, protect, replace, change or remove our pipeline(s) and install <br />additional pipelines. Kaneb must be provided azea that provides for our use and <br />enjoyment of these rights. Until this has been resolved, Kaneb would continue to request <br />that the Division of Minerals & Geology hold the application presented by Coulson. <br />Should you have any questions regarding this matter, feel free to contact Lee Childres <br />(Vice-President of Engineering), Michael Reames (Right-of-Way Agent), or myself at <br />(316) 773-9000. <br />Sincerely, <br />~`Z~%~~ <br />Dale .Smith <br />Man ger of Engineering <br />CC: Lee Childres/ Michael Reames, Kaneb Pipe Line Company <br />