Laserfiche WebLink
<br /> <br />Fahibit D.- W.ildlifc, iJ;rtcr Rcsourcus~ .Soi Is 1'oy,r•lnl ion Infnnnal inu <br />Con tar[ Cite ]oral 17ivisirni of l!il~llifc nffir~ feu .~ wildlife inil,arl <br />assessment and attach Cheir statement to Chi, nppliratinn. <br />2 <br />3. <br />Contact Ute local office oC the Snil Crmscrvnlion tiervico fnr an on-site <br />soils and vegetation information <br />AtL~cli llicir report to this application <br />IJater Resources <br />A. Ilrnd much wafer will he used in cunjnnrtirm with Chit; miuin;; operation? <br />Where will you acquire this water? Do you linve a;~prnpriaCC industrial-use <br />water rights? No water use is_raz,;red. _ __ _ _ ___ <br />(1JaCer Rights arc required f'nr such it:em:; ne; dust cunln~l, processing, <br />ponding, etc.) <br />13. If ponding is to be p;trC of your reclanurCion plan, identify Che water <br />right associated with the proposed ponds. <br />Exhibit E - Reclamation Plan <br />The operator is encouraged to consul.[ with their local Soil Conservation Service <br />representative fnr on-site reclamation recor.imendatinns~:unl revler+ I?ule 6. <br />1. (Jill you be following the rcc.lamneion l;uidt~lincs providcJ by the Division <br />of lJildlifc and/or [lit Soils Conservation Sc•rvicc? Czipple Creek_Field.office <br />of__t11a_Sl.~.L.A., ~ ~ S, has. assisted in all~hases of this rec]amation~an. <br />2. Slopes will be graded to a maximum (horizontal Co vertical) slope of: <br />3:1 (j1V) (cr.amplc 3:1). <br />3. lC applicable, the depth of ovcrburJcn to Lc replaced will be_ None __ <br />4, Topsoil will be replaced to a minimum depth of _ _ -inches. <br />--(~rani;e) <br />5. Staff recommends that topsoil. and subsoil hr disred to nt Ienst G" to <br />provide fnr binding, and runt pcnclrnCirvn. Yes. <br />6. '1'hc site will 6c planted, laic fell or oarly ~prin~;'? Either early spring of <br />during July to take advantage of the stunmr thunderstorm preceptation as per <br />S.C.S, recamlendation. <br />