My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE109099
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE109099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:01:35 PM
Creation date
11/24/2007 5:49:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
11/3/2006
Section_Exhibit Name
3.0 Project Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3~3 nRIL,LING <br />3.3.1 Tvg¢s of DrjLli_~ <br />AC TcappRr kin¢ them are thr@e types Of drilling~ blast hole dsilli~;g, ex~2o~a- <br />tion tlrilling and development drillin8• Blast hole flrilliRg oscC,rs only t•zrkia <br />the p@rmi_t area and Ls tegVizad For the b1asC,ing operatiq~. ThQ hele,r are reeaed <br />fot pl_acPmeht of °-xplosive~ th ftagtaent overburden„ ihterburdep a>v eoa2. Hors <br />sliest depths and spacings vary eCcordigg to the thic~~ess ~.od naa>rg o€ the <br />material to be blasted. Because ttte holes are dulled just ahead nF, ~; ~ii~;in <br />an ad4antiing pit, they are removed by stripbing or mLning within eeyorl} hunths <br />or less. Eor taore_ da_tail Rn blaycing> see Section 3.~. <br />Exploration drilling occur" outside th@ permit qre:~ and is te9uirEd to determ;.ne <br />the ekteht of the coal resarvns and to provide inf7rmation On coal depth, Ybir-k- <br />ness and quality, A11 ekploration dril.liRg 1s conduCted ih ComAliaoce wjrb <br />applihable U.S, Bureau of Land Aianagement add Stage 4f ColOrago regulaCio>LS and <br />will he handled by separatR p@rmits, <br />Devehtpm¢nt drilling ix, required c,o proWid® d$ta for plagnigg pit dimension,,, <br />sequehcing activities and equipment scheduling. Typically, development dtitling <br />is conducted at Gr heat the projected coal cropline anti the ecohomic 6tzippiog <br />liynit ahead, of advagcing l,it~ ahd wheYe new pits are planned within, the ;nertnit <br />area. Drilling depths needed to further define the cropline are usua114 Daly to <br />the coal in g4es[ioR• Depending upon th@ info~atioh obtained, drilling >nay be <br />conducted defining Che cropline to within 25 feet 11or{zontally. The economic <br />stripping Limit is defined in mach the same magnet except it is not necessarily <br />located as accurately as the cropline. <br />Prior to stripping, cha overburien is dri,llbd and blasted. Overburden drilling <br />and blasting precedes stripping by one to five Pit wiry[h5• Before the overburden <br />is drilled and blasted, the topsoil is Yemoved. Topsgil removal is conducted <br />dyring the fair Weathet months of May [h rough ~OctobQr. Therefore, each year's <br />~_z~ ~{t"i{~514f~ <br />JR~t°RA!'~~ <br />L14?•F .2 1~ 9~~.. <br />/nz ~ ~ y <br />R~vys~D FEB 1 a'8a <br />
The URL can be used to link to this page
Your browser does not support the video tag.