Laserfiche WebLink
Oate : 04r24l1006 <br />User: JRS <br />County :Delta Abbreviation :none <br />Site :Bowie No. 2 Mine Filename : C083-222 <br />Agency or organization name :Colorado Division Of Minerals And <br />Permlt or other job action :Minor Revision 65 <br />Task description : Regl <br />F~OURLY EQUIPMENT COST <br />Cost Breakdown <br />Three Drill Pads <br />Basic machine : Cat 09R - 9SU Horsepower : 405 <br />Blade type : SBmi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : 3shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Ownership cosVhour : $56.94 NA <br />Operating cosUhour: 5109.98 100 <br />Ripper op.cosVhour: $0.00 0 <br />Operator cost/hour: $32.53 NA <br />Total unit cosUhour : $194.45 Total fleet cosUhour : S19d_dS <br />MATERIAL tlUANTITtE3 <br />Initial <br />volume : 3,600 BCY <br />SweN Loose <br />factor : 1.330 volume : 4,788 LCY <br />Source of estimated volume :Division EsBmate <br />Source Of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Cortdftion Cortedion Factors Source <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1,243.2 LCY/hr <br />Material consistency description <br />fib or embankment <br />Average push gradient : 5.00 % <br />Average site altitude : 7,300 feet <br />Material weight : 2, 900 Ibs/LCY <br />Weight description <br />Operetor skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil prle : 0.80 <br />Push gradient : 0.90 <br />Altitude : 1.00 <br />Material weight : 0.79 <br />Blade type : 1.00 <br />Net correction : 0.32 <br />Decomposed rock - 50% Rock, 50% EaRh ~ Adjusted unit production : 399.15 LCYAtt <br />Adjusted fleet production : 399.15 LCY/hr <br />_:. <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Total job time : 12,tM Hours <br />Unit cost : $0.487 /LCY Total job cost : x2,333 <br />, <br />