My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE109060
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE109060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:01:32 PM
Creation date
11/24/2007 5:46:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080A
IBM Index Class Name
Permit File
Doc Date
7/8/2004
Section_Exhibit Name
Section 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
collection ditch to prevent any disturbed area runoff escaping from the northeast corner of the <br />surface Facilities area. The West Collection Ditch collects surface drainage from the northwest <br />segment of the haul road, and a small area of the Permanently Reclaimed Spoils Area and conveys <br />the runoff to Sediment Pond No. 2. Runoff from Topsoil Pile No. 2 is contained within a small <br />berm constructed azound the toe of the pile. No significant amount of water is ever retained by this <br />berm. The culvert crossing for this ditch under the access road is unchanged from the approved <br />plan. After final bond release is granted, this ditch and culvert will remain to provide drainage for <br />the development site. <br />Designs for collection ditches and channels are contained in Appendices 5-2, 5-9, and on Map 5-10. <br />All ditches were constructed to control the design flow and to minimize erosive velocities during <br />design event conditions. <br />Detention Sumps <br />The bench in the North Pit will be reduced to a width of 30 feet for reclamation, and the bench itself <br />and all areas above it will drain to two sumps, as shown on the Hydrology Map. These two sumps <br />are called Upper Sump 1 and Upper Sump 2. The north bench and the disturbed slope above it will <br />drain to the North Pit access road and road ditch. A small sediment sump (Lower Sump) will be <br />installed to collect the runoff from the 100 yeaz event for the 1.13 acre downspoiled azea that does <br />not drain to any other sediment facility. <br />Design Volume Calculations Upper Sump 1 <br />Area Drainage Area (acres) 4.37 <br />Design Event 100 yr. storm <br />Design Precipitation 3.2 <br />Average CN 89 <br />Calculated S 1.23595505618 <br /> <br />Description Exposed gravel and rocky soil before <br />vegetation <br />Calculated Runoff Volume (Q) 2.08 <br />Calculated Runoff Volume (acre-ft.) 0.76 <br />Ponding Percentage 5.00 <br />Actual Runoff Volume (acre/ft.) 0.72 <br />As shown on the Hydrology Map, this sump contains approximately 1.09 acre-feet. This sump will <br />have arip-rapped trapezoidal spillway width of 10 feet and a 0.5 foot depth to pass any overflow <br />from storms above the 100 year event. <br />TR09, TRl 1, TRt2 (v1.0) 5-6 Revised 3/98, 8/02, 9/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.