My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE109060
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE109060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:01:32 PM
Creation date
11/24/2007 5:46:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080A
IBM Index Class Name
Permit File
Doc Date
7/8/2004
Section_Exhibit Name
Section 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Topsoil Stockpiles 2,3,4,7, and 8 <br />With completion of the final grading operations at the North Pit, South Pit, <br />Permanently Reclaimed Spoils Area, roads, and equipment storage area, topsoil will <br />be redistributed from the topsoil stockpiles as identified above. When all topsoil is <br />removed from a given stockpile, sufficient topsoil from the stockpile will be <br />retained to retopsoil the basal area of the topsoil stockpile. Topsoil stockpiles 7 <br />and 8 will retain adequate volumes of topsoil to Retopsoil Sediment Ponds 1 and 2 <br />after the determination that they aze no longer required and they have been regraded. <br />Retopsoiled topsoil stockpile locations (footprints of the former stockpile locations) <br />will be revegetated in accordance with the revegetation plan. In the event that there <br />is topsoil in excess of that required to replace a maximum of 12-18 inches of topsoil <br />on the disturbed azeas of the Cazbon Junction Mine, excess topsoil may be replaced <br />on adjacent disturbed and/or reclaimed azeas owned by Oakridge Energy on Ewing <br />Mesa. <br />Reconstruction of Carbon Junction Canyon <br />The restoration of the Cazbon Junction drainage will be part of the final reclamation <br />plan and is bonded for the cost of the work, The work involves a diversion of 1962 <br />feet that will be riprap lined and will have one culvert crossing under the main <br />access road. The channel itself will be 14' wide after lining and vazies in depth from <br />1.9 feet to 2.8 feet for segment 6, including freeboazd. <br />TRO8, TRl 1, TR12 (v1.0) 5-31 Revised 9/97, 08/02, 9/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.