My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE109060
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE109060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:01:32 PM
Creation date
11/24/2007 5:46:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080A
IBM Index Class Name
Permit File
Doc Date
7/8/2004
Section_Exhibit Name
Section 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following table describes the underlying filter material that will be used for each <br />section. The design of this material is based on studies done at Colorado State University <br />and presented in Design Hydrology and Sedimentology for Small Catchments. <br />During the excavation, areas of lazge rock or actual bedrock may be encountered. When <br />this occurs, filter material may not be used. If bedrock is substantial, the riprap lining <br />may also be eliminated. For the filter material design, it is assumed that the base material <br />will have D50 of 2". The azea of the channel construction is generally rocky in nature. <br />Segment <br /># Riprap <br />D50 (ft) Riprap Thickness <br />Range (ft) Filter Material <br />D50 (ft) Filter Material <br />Thickness (ft) <br />1 1.75 1.75-2.50 0.25 0.25-0.50 <br />2 1.75 1.75-2.50 0.25 0.25-0.50 <br />3 1.75 1.75-2.50 0.25 0.25-0.50 <br />4 None DNA DNA DNA <br />5 2.50 2.50-3.50 0.25 0.25-0.50 <br />6 1.00 1.00-2.00 0.25 0.25-0.50 <br />A filter material of 0.25 feet or 4" will work for all segments. <br />As shown on the Hydrology Map, the Cazbon Junction Canyon will be restored in its <br />original channel for the majority of the length upstream from the permanent diversion. <br />For this azea, no lining will be needed. However, two portions of the channel, one near <br />the upper end of the diversion, and the other neaz the lower sump, will need to be lined <br />with riprap of D50 of 1.5 feet. A layer of 1.5 feet to 2.5 feet will be placed in a channel <br />width of 14 feet. No underlying filter will be employed in these areas since the existing <br />material is rocky. The approximate lengths of the two upstream lined azeas are 150 feet <br />and 350 feet. <br />Certification and Inspection <br />The designs for the various structures have been appropriately certified. The sediment <br />control system will be inspected during construction and certified by a registered <br />professional engineer as required. <br />TR08, TRl1(v1.0) 5-17 Revised 9/97, 08/02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.