Laserfiche WebLink
Reclamation Draft 1/9/9812:72 PM <br />• <br />• <br /> <br />Farm Tractor <br />- <br />_ <br />_ <br />Disking 1 <br />__ $/HrEquipment $30.00 <br />$/Hr Labors $20.00 <br />Width, ft. • 15 <br />Miles Per Hour; 5 ~ I <br />_ Acres/Hour~ 9.1 i ~ <br />$/Hour $50.00 I 1 <br />_ Gross$/Acre $5.50 <br />Net $/Acre 56.11 <br />(Efficiency) 90% <br />Seeding/Fertilizer <br />$/I-ir Equipment $40.00 Tank/Spray Added <br />$/Hr Labor $20.00 ~ <br />Fertilizer $35.00 I <br />Gravel Seed Mix $200.00 <br />Granite Seed Mix $223.64 Granite Quarry Seed Wt. Ave. Cost <br />Spray Diameter, ft. l5 Total Acres 64.31 <br />Miles Per Hotu 2 Bench Acres 191 <br />Acres/flour 3.6 Total Ac Reclaimed ~ 28.935 <br />(Efficiency) 90% Bench Ac Reclaimed I 8.55' <br />GRAVEL Non Bench Ac Recl. 20.385' <br />Gross$/Hour $915 Bench Seed Cost 5280.00 <br />Gross $/Acre $251.50 Non Bench Seed Cost 5200.00 <br />Net 5/Acre $253.33 j <br />GRANITE ~ 1 <br />Gross $/Hotu $1,001 ~ <br />Gross $/Acre $275.14 <br />Nets/Acre $276.97 I ~ <br />Hydromulching I <br />$/Hr Equipment $40.00 Tank/Spray Added <br />$/1-Ir Labor $20.00 <br />Hydromulch w/tackifier $300.00 ~ <br />Spray Diameter, ft. IS <br />Miles Per Hour 1.5 ~ ~ <br />Acres/Hour 2.7 I <br />(Efticiency) 15% Reflects # of Passes & Tank Filling <br />Gross $/I-Iottr $878 <br />Gross $/Acre $322.00 <br />Net 5/Acre $446.67 <br /> <br /> I ' 1 <br /> <br />Bench DrillingBlasting:Rubblizing $37,674 Total $14.95 $/Ft <br />Length 4,200 I <br /># Benches 6 <br />Benches Rubblized 10% Ft ~ °j° ~ <br />Rubblized Length 2,520 Phase I % ~ 675 ' 16% <br />Drill Hole Separation, ft. 10~ Phase II% 750 18% <br />Hole A Depth Ft ~ 7 i Phase III% ~ 2.775 1 66% <br />Hold B Depth Ft~ 14 I 4,200 i 100% <br />Drill fleet 5,292 ~ I <br />Drill Width, Inches 3 I <br />Drilling $ Cost/Ft & Total $ $4.50 $23,814 <br />Explosives $/linear ft. & Tota] $~ $5.50 $13,860 Qtlote, Buckley Powder 12/22/97 <br />Page 2 <br />