My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE108994
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE108994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:01:28 PM
Creation date
11/24/2007 5:37:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997054
IBM Index Class Name
Permit File
Section_Exhibit Name
EXHIBIT L RECLAMATION COSTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ii i iii i ii iiiiii iii <br />Exhibit L CMLRB 112 Permit Application <br />Agile Slone Systems, Inc. <br />• Exhibit L Reclamation Costs <br />Five tables have been prepared highlighting the expected reclamation costs. Table I <br />identifies the individual areas involved in any project disturbance, the associated acreage <br />with each azea in the permit, the acres reclaimed in each area and when they would be <br />reclaimed. Highwall perimeter to be rubble-ized is also listed for the granite quarry. <br />Four key assumptions are identified: the 20% of costs for administrative costs, the 6 main <br />50' benches, expected 12" top soiUfines depth and the expected 40 to 50% reclamation of <br />the quarry acreage. Acreage determinations within the permit and disturbance areas are <br />straight forward except for the Roads, Tracks, Ponds and Storm Berm category. Acres <br />for the gravel, granite and plant areas are the same as submitted previously. Any <br />confusion from the Phase I, II and III mining progression should be completely <br />eliminated. All phases have and aze included in the permit application. The permanent <br />berms are simply comprised of the visual blocking berms "required" by the applicant's <br />CUP and from requests made by various citizens groups. The remaining Roads, Tracks, <br />Ponds and Storm Berm category can and is more clearly defined. <br />Since the project has proposed a 100' buffer be associated with most perimeter roads, the <br />entire 100' width is included in the total and disturbed acres. The total, disturbed and <br />• <br />reclaimed acres for roads, raihoads, ponds and storm water berms is: <br />Total Acres Disturbed Acres Reclaimed Acres <br />Roads 24.63 11.69 11.69 <br />Railroads 4.83 4.83 2.34 <br />Service Area 5.00 5.00 0.00 <br />Pouds 2.20 2.20 0.00 <br />Berms 2.40 2.40 0.00 <br />Totals 39.06 26.12 14.03 <br />The road buffer areas will not be entirely disturbed. A maximum 25' road and drainage <br />swale will be disturbed from which top soil will be removed prior to road construction. <br />Limited adjacent buffer areas could be used to stockpile large decorative rocks at selected <br />sites particularly along entrance roads. Should these buffer areas be used for product <br />storage, the associated top soil would be removed. As an estimate of acreage for top soil <br />disturbance and recovery, 50% or less of the total road acres within the 100' bufTers are <br />assumed to be disturbed. The remaining 50% will remain in native vegetation without <br />removal of its top soil to maintain erosion and top soil stability. The reclaimed road acres <br />will then equal the temporary roads reclaimed and buffer areas used for limited <br />stockpiling. This is estimated at 11.69 acres. About half of the tracks will be reclaimed - <br />the tracks to and in the quarry. The ponds and storm water berms will remain as part of <br />the long term storm water stabilization plan. <br />t <br />
The URL can be used to link to this page
Your browser does not support the video tag.