Laserfiche WebLink
• TABLE G-8 <br />SEASONAL AVERAGE DILUTION FACTORS <br />Dec, Jan, Mar, Apr, Jun, Jul, Sep, Oct <br />Feb May Aug Nov <br />Project <br />flow, cfs 0.32 1.6 1.28 0.60 <br />River <br />flow, cgs 1,368 5,016 7,144 1,672 <br />D/C 0.000234 0.000319 0.000179 0.000359 <br />• Dilution <br />factor 4,300:1 3,100:1 5,600:1 2,800:1 <br />Note: D = volumetric flow off the site. <br />C = volumetric flow of the Colorado River estimated at <br />the mouth of Parachute Creek. <br />Source: Metcalf & Eddy, 1975. <br />• <br />G-18 <br />