My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE108732
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE108732
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:01:13 PM
Creation date
11/24/2007 5:14:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982020
IBM Index Class Name
Permit File
Doc Date
5/18/1993
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hoada6le equipment: • • sheet 2 of 2 <br />" """ """ " " Total Bqp. Fleet Siee 8eul Trip Return Trip <br />Nachine Description Cost/hr (no. hauled) Cost/hr Cost/hr <br />------------------------------------------------------------------------------------------------------- <br />------------------------------------------------------------------------------------------------------- <br />------------------------------------------------------------------------------------------------------- <br />------------------------------------------------------------------------------------------------------- <br />Subtotals ; <br />MOB/DBHOB SUPP08T E6UIPlIEIJT: " " ""' " " " "' <br />"" " " """ " "" " ""' Yeight Oxnershio 8au1 Big Fleet Site Aaul Trip 8eturn Trip DOT Percit <br />IJon-Rcada6le Hqp. Description (tons) Cost/hr Cost/hr (no. hauled) Cost/hr Cost/hr Cost/ea <br />-------------------------------------------------------------------------------------------------------------------- <br />Total Bqp. <br />6oadable Bqp. Description Cost/hr <br />------------------------------------------------------- <br />------------------------------------------------------- <br />------------------------------------------------------ <br />------------------------------------------------------ <br />Subtotals <br />......... ......... ......... <br />Fleet Siee Naul Trip Return Trip <br />(no. hauled) Cost/hr Costlhr <br />------------------------------------------ <br />------------------------------------------ <br />-------------------------------------- <br />Subtotals <br /> <br />BBUIFHBIIT AAUD DISTAACB l TIHB <br />------------------------------ ......... . ........ <br />Nearest major city or toxn xithin project area region: <br />.................. <br />.......... <br />...... <br />...................... <br />Total one xap travel distance = 15.0 <br />...... Hiles . .overage travel speed = <br />.... 20.00 <br />......... mph. <br />Job Tine - Ilon Boadable Bquip. = 0.50 hours load Roadable Bquip.= IJ/A Iours load <br /> 0.75 hours haul 0,75 hours haul <br /> 0.50 hours unload Il/A hours unload <br /> 0.75 <br />------ hours <br />------ return <br />--------- 0,75 <br />-------- hours <br />------ return <br />-------- <br />JOB COST <br />Total Hob/Demob Cost = 4650.98 <br />NOTB: Non-roadable equipnent (haul rig required to transport) nob/deroh coats based on 2 round trips, each trip <br />consisting of a one-way loaded haul and a one-xay enptp return. 8oadable equipnent (no haul rig required) <br />costs based on one round trip, Colorado DOT requires special pernits for oversiee equipnent on certain <br />specified road segments within the State. Separate pernits are required for each rig on each loaded trip. <br />Additionally, pilot cars (one or two per rig depending on degree of oversiee( ere also required far oversiee <br />equipnent hauling, and loading/unloading tines Host be increased substantially for equipnent which cost be <br />oartially discantled for transport and re-assembled at the job site. Costs for lifting equipment and ether <br />support equipcent needed for this work should be included in the mob/demoh costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.