Laserfiche WebLink
<br />RECLAMATION COST SUMMARY tont'd sheet 3 of 4 <br />H. EART NNORK - STREAM CHANNEL RECONSTRUCTION <br />Task <br />_____ No.~ <br />.._I_______ Task Destri ption <br />______________~________________...._._ ~ Cost <br />____I_______ (S) <br />___ <br />Subtotal (H): <br />I. EARTNNORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (f) <br />Subtotal (1): <br />J. EART HNORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description <br />3 I TOP SOIL PLACEMENT <br />Cost (f) <br />I____________ <br />f2, 286 <br />Subtotal (J): 52,286 <br />