Laserfiche WebLink
• Table 4.4.3-1 Interim Reclamation Timetable (cont'd) <br />Time Description <br />4. Flood and sprinkler irrigation. <br />Fall, 1981 1. Seed, fertilize and mulch non-operational <br />dryland disturbed areas: <br />a) haul road right-of-way; <br />b) upper stockpiles. <br />Spring, 1982 1. Erosion control as necessary. <br />2. Interseeding as necessary. <br />Summer, 1982 La <br />1. <br />• 2. <br />3. <br />4. <br />5. <br />ndscape maintenance including: <br />Erosion control, <br />Mowing, <br />Maintenance of nursery stock. <br />Maintenance fertilization, <br />Irrigation, <br /> <br />4-77 <br />