Laserfiche WebLink
<br />Ridley Gravel Pit <br />Exhibit D -Mining Plan <br />Mining and earth moving will be done entirely by front end loader. <br />No water will be used for the mining operation with all mining being conducted <br />well above the water table. <br />One (1) to two (2) acres of the permitted area will be worked at each stage of <br />operations. Material will be stockpiled on site to be removed at a later date by <br />truck. <br />The time table for each stage is estimated to be between 1-2 years with the size <br />of the area being mined to be a maximum of 2 acres. Each stage of production <br />will conform with the directional pattern as set forth in the mining plan map. <br />Mining will consist of rock, sand and gravel with the mining depth being an <br />average of 8 to 10 feet. <br />The extracted materials will be used on Bent County road surfaces <br />No explosives will be used in the mining process. <br />