Laserfiche WebLink
FROM <br />FRX N0. 17198464975 Oct. 06 2006 07:15AM P2 <br />TABLE OF CONTENTS (Continued) <br />Maps/Figures <br />Map 2.03.4-1 Surface Ownership <br />Map 2.04.3-1 Premine Land Use <br />Map 2.04.3-ta Premine Oil and Gas Development <br />Map 2.04.6-1 Drill Hole Locations <br />Map 2.04.6-2 Geology Map <br />Map 2.04.7-1 Water Resources <br />Map 2.04.7-2 Stream Laid Deposits, Water Rights, and Historically Irrigated Lands <br />Map 2.04.7-3 Alluvial Gradient <br />Map 2.04.7-4 Interburden Potentialmetric Surface (Primero) <br />Map 2.04.7-5 Primero Coal PotentiometricSurface <br />Map 2.D4.7~ Inderburden Potentiometric Surface <br />Map 2.04.9-1 Soils <br />Map 2.04.10-1 Vegetation Community Map <br />Map 2.04.11-1 Wildlife Surveyand Transect Locations <br />Map 2.05.3-1 Mine Plan <br />Map 2.05.3-2 5-Year Mine Plan <br />Map 2.05.3 Haul Roads <br />Map 2.05.3-3a Haul Road Plans <br />Map 2.05.3-3b JefrCanyon Haul Road <br />Map 2.05.3-3c Lorencito Canyon Hauf Road LC 01 <br />Map 2.05.3-3d (Removed From Permit qy PR-1) <br />Map 2.05.3-3e Top Soil Salvage Area <br />Map 2.05.3 Surface Blasting Area <br />Map 2.05.3-5 Topsoil Recovery and Placement Plan <br />Map 2.05.3E Soil Borrow Areas <br />Map 2.05.4-1 Surface Mine Post Mining Topography <br />Map 2.05.4-2 Post Mining Topography 2003 <br />Map 2.05.5-1 Post Mine Land Use <br />Map 2.05.5-2 Past Mine Industrial Land Use <br />Figure 1 Location Map 1-2 <br />Figure 2.04.6-1 Regional Geology 2.045 <br />Figure 2.05.2-1 Generic Mine plan Layout Mains and Panels 2.05-2 <br />Figure 2.05.3-1 Representative Cross Section of Mining Sequence Sheet 1 of 4 2.05 <br />Figure 2.D5.3-2 Representative Cross Section of Mining Sequence Sheet 2 of 4 2.05-7 <br />Figure 2.05.3 Representative Cross Section of Mining Sequence Sheet 3 of 4 2.05-8 <br />Figure 2.05.3.4 Representative Cross Section of Mining Sequence Sheet 4 of 4 2.059 <br />Figure 2.05.3-5 Office Layout 2.05-14 <br />Figure 2.05.3$ 10°h Side Slope 2.05-18 <br />Figure 2.05.3-9 20% Side Slope 2.05-19 <br />Figure 2.05.3-10 30% Side Slope 2.05-20 <br />Figure 2.05.3-11 40% Side Slope 2.05-21 <br />Figure 2.05.3-11a 5o%SideSlope 2.05-21a <br />Figure 2.05.3-12 Example ofAltemative Culvert Design 2.05-24 <br />Figure 2.05.3-13 Culverted Ford 2.05-25 <br />Figure 2.05.3-14 Road Configuration 2.05-27 <br />Figure 2.05.3-14a Light Use Roads to Ponds 007a, 009, and 009a 2.05-29a <br />Figure 2.05.3-14b Minor Revision #4 -Service Area and Pond OD9A Topsoil Stockile 2.05-29b <br />Figure 2.05.3-14c Minor Revision #10 -Pond 9 Sediment Drying Area 2,05-30b <br />Figure 2.05.3-15 Raw Coat LoadoutArea 2.05-31 `~/~ /b ~ <br />TR-14 viii ie....:__~ ..~....../._. <br />