Laserfiche WebLink
• <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1313 Sherman St.. Room 215 <br />Denver, CG 80203 <br />303 666-3567 <br />F'nx: 303 8328106 <br />III IIIIIIIIIIIIIIII~ ~ coLO~o <br />~pF C~OCO <br />ti``. W~'retlt"~9$ <br />NT/ <br />i <br />.,\..."y <br />~~-`~ <br />x/876 <br />Roy Romer. <br />Govemar <br />F*etl R. Banta. <br />Drvis~on Direc~or <br />November 1, 1991 <br />Mark A. Heifner <br />37 E. Colorado Avenue <br />Denver, Colorado 80210 <br />RE: Items Required by the Division for Proper Reclamation Bond Calculations, <br />Transit Mix Concrete, Daniel's Sand Pit lt2, Permit No. M-73-007-SG <br />Dear Mr. Heifner: <br />On October 29, 1991 Mr. Bud Herskind, President of Transit Mix Concrete, <br />contacted Mr. Bruce Humphries, Supervisor of the Minerals Program at Mined <br />Land Reclamation, requesting a meeting to resolve issues raised during the <br />9/19/91 site inspection by the Division. The Division feels before such a <br />meeting can be held, the following information must be provided to properly <br />calculate the required reclamation cost. <br />..1. Operator must identify all structures that have concrete slab <br />floors, and describe the composition of each structure, i.e. <br />concrete, wood, steel, masonry, etc. and include all dimensions. <br />~•2. The total acreage that would need to be topsoiled and seeded. <br />~ 3• An existing disturbance contour map, with contour intervals of no <br />greater than two feet. <br />4. Representative cross-sections of main pit areas, showing both the <br />existing and proposed regraded configurations. <br />Q5 Provide the height, length and angle of all the highwalls in the <br />disturbed area. If the operator provides a good set of maps and <br />comparative cross-sections as requested in Item i/3, these <br />dimensions will not be required. <br />~6. A detailed backfilling and grading plan of the permit area specific <br />to each pit. <br />C~ Identify all portions of reclaimed surfaces that are subject to <br />compaction during mining operations, such as haul and access roads, <br />yards, lay-down areas, etc. All such areas would need to be ripped <br />prior to topsoil distribution. <br />