Laserfiche WebLink
' 3.02 General Requirements <br />Reclamation of the disturbed area will require performance of the <br />activities shown in Table RP-1 (Section 2.05.4). Tbeae actions include restoration <br />of the land surface and reclamation of those areas, as well as removal of operational <br />equipment and structures. The coats of reclamation for each unit have also been <br />shown. It ie estimated that a three-year growth period will be required to <br />demonstrate the success of revege[ation. <br />The form, conditions and term of the bond will be arranged with the CMLRD <br />before the permit is issued. <br />.• <br />J <br />130 <br />