Laserfiche WebLink
~• REPORT ON STABILITY ANALYSES <br />AND <br />RECOMMENDATIONS FOR RECLAIMID <br />SDRFACE FACILITIES <br />AT THE <br />MT. GIINNLSUN NO. 1 MINE <br />L SCOPE AND OBJECTIVE <br />The ARCO Coe1 Company, a division of Atlantic Richfield Company, intends to build and <br />operate a .250 million ton per year coal mine on its ML Gunnison property near Somerset, <br />Colorado. The ARCO Coel Company is committed to the development, operation and <br />reclamation of this mine in en environmentally sound manner. The Oifice of Surface <br />Mining (OSM) and the Mined Land Reclamation Board require that the site be returned to <br />its approximate original condition at the conclusion of all mining activities. It is the <br />ARCO Coal Company's present intent that the surface facilities shall be removed or <br />dLsposed at that time, and that the site shall be returned to its approximate original <br />condition end approximate original contours (AOC). An investigation has been made to <br />evaluate the procedures for reclaiming certain surface Pacilities that have been planned <br />and that lie within an area designated for potential slide activity. It is the purpose of this <br />report to summarize this investigation end to make recommendations for the reclamation <br />of these and other related surface facilities at this site. <br />(• The surface facilities that have been planned and which lie within the area .designated for <br />' ~ potential slide activity include a section of the main access road, the portal bench, the <br />substation end the shop warehouse (refer to the Site Plan reference sheet). A dewatering <br />system has been investigated and it will be installed to stabilize the sites of these planned <br />facilities during the proposed construction and the operational life of the mine. The <br />reclamation of these sites requires special consideration in order that these areas remain <br />stable after the site has been returned to its approximate original condition Merrick $ <br />Company has conducted an extensive analysis of various alternatives for reclaiming and <br />restoring these and the related areas to ensure a stability factor of safety of 1.3 or <br />greater. <br />This report contains recommendations on the procedures to be followed for reclaiming <br />those areas within the said Landslide Boundary. Our recommendations are based on the <br />results of extensive Slope Stability Investigations. Tn addition, recommendations are <br />included in this report Por the disposal and reclamation procedure to be followed for other <br />related surface facilities which lie outside the Landslide Boundary. Topsoil spreading and <br />revegetation recommendations ere beyond the scope of this report except as they apply to <br />reclamation of the facilities within the Landslide Boundary. The reader should refer to <br />the Mining end Reclamation Plan for further information on topsoil spreading and <br />revegetation. <br />(. <br />