Laserfiche WebLink
<br /> <br />EXHIBIT D - RECLAMATION PLAN <br />PECK PIT <br />When mining is completed the bar will have a <br />northerly slope the same as the river gradient <br />and a westerly slope of 1 foot in 500 feet. <br />All banks will be mined at a 3 to 1 slope <br />Seeding will be as recommended by the Soil Conservation <br />Service. <br />Estimated Reclamation Costsi <br />D-5 Cat for finish grading 10 hrs. <br />;50.00/hr. $500.00 <br />Seeding and fertilizer $200.00 <br />Total Estimated Reclamation Costs X700.00 <br />