Laserfiche WebLink
~>l ENVIRO•TESTLTD. <br />SHERIDAN ENTERPRISES LOMA CENTRAL LOADOUT <br />EMISSIONS COMPARISON TONS/YEAR <br />PROPOSED VS PREVIOUSLY EXISTING FACILITIES <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />PREVIOUSLY EXISTING <br />EMISSION SOURCE FACILITI~ 75,000 <br />CONTROL $ RIDUCTION TCNS/YF.~R NO CONPROLS <br />Haul Road Traffic - 16.89 <br />Resinous Adhesive (85$ on <br />Proposed Only - No Control <br />on Previous <br />Product Unloading .- 0.26 <br />Truck End Dump <br />No Controls <br />Stockpile - Wind Erosion - 0.01 <br />50$, Water on Proposed Only <br />Maintenance - 0.42 <br />5,000 tons stored <br />Prociur.t Removal from Stockpile 9.50 <br />.Front F.nd Loader <br />Product Loading into Hopper <br />or Rail Car (Front End Loader) 0.01 <br />Crushing - Screening Operation 4.50 <br />Transfer - Crushing Screening <br />Operation to Converyor 0.75 <br />Conveying 7.50 <br />Transfer-Conveyors to Rail Cars 0._75 <br />Totals 35.59 <br />PROPOSID FACILITIES <br />350,000 tons/yr <br />CONTROLLID <br />11.82 <br />1.23 \ <br />0.01 <br />0.21 <br />21.00 <br />0.04 <br />NONE <br />NONE <br />NONE <br />NONE <br />34.31 <br />Net Change decrease 1.28 <br /> <br />