Laserfiche WebLink
ENVIRO•TEST LTD. <br />SHERIDAN MUNGER MINE <br />PROJECTED EMISSIONS <br />897,000 TONS/YEAR <br />EMISSION SOURCES <br />CONTROL $ REDUCTION <br />UNCONTROLLED <br />EMISSIONS <br />1. Converyors - wet Coal 50$ 89.70 <br />2. Transfer - Mine Conveyor to <br /> Screenin g/Crushing Operation 8.97 <br />3. Screening - Enclosed 90$ <br /> Wet Coal 50$ <br /> Total Control= 95$ 44.85 <br />4. Crushing - Total Production 20$ <br /> Partially Enclosed 90$ <br /> Wet Coal 50$ <br /> Total Control = 95$ 1.79 <br />5. Transfer - Screening/Crushing to <br /> Conveyor - Partially Enclosed 90$ <br /> wet Coal 50$ = 95$ 8.97 <br />6. Transfer - Conveyor to Surye pile - <br /> Stocking Tube 50$ <br /> Wet Coal 50$ =75$ 8.97 <br />7. Stockpile 4,000 ton- <br /> Wind Erosion= 0.002 <br /> Maintenance- 0.39 <br />8. Load from Stockpile <br /> Control-Wet Coal-25$ 53.83 <br />9. Load into Haul Trucks-No Control 0.09 <br />10. Haul Road Traffic Paved - <br />100$ Control 585.26 <br />Totals 802.77 <br />CONTROLLED <br />EMISSIONS <br />49.85 <br />9.49 <br />2.24 <br />0.09 <br />0.45 <br />2.24 <br />0.001 <br />0.17 <br />40.37 <br />0.09 <br />0.00 <br />94.99 <br />