Laserfiche WebLink
- 2 - <br />drilling and within a few days subsequent to drilling. The location • <br />of the ground water levels measured and the number of days subsequent <br />to drilling are shown on the Legs of Exploratory Holes (Figs, A-1 <br />through A-3). Slotted P4~ pipe was installed in scone of the test <br />holes to nnnitor futuce ground water levels. <br />The location of 6 perrolation tests conducted at the site of the <br />three sediment ponds are shown on Fig. 3, The test results are <br />presented in Table II. Percolatirn tests were performed in accordance <br />with guidelines published in the U.S. [impartment of Health, Education <br />and Wielfare Manual of Septic Tank Practise (formerly Public Health <br />Service) Publication No. 526. <br /> <br />