Laserfiche WebLink
3. Ttie applicant must give the dimensions of the berm around the shop area as <br />well as an estimate o.` what design event the berm can divert away from the <br />disturbed area. <br />• Response: I:ot applicable. This question apparently refers to the berm <br />around the proposed central shop area, <br />4. The applicant has indicated that sediment from this pond will be "placed <br />within this disturbed area". Specifically, where will i[ be placed? Unless <br />the applicant can justify the safe disposal of this sediment, the Division <br />will require that the naterial be placed in the refuse disposal area. This <br />material is easily eroded by wind, truck traffic, and water. <br />Response: Northern wishes to change the location of the placement of this <br />sediment. The sediment from the pond will be placed in the refuse disposal <br />area. <br />Northern "Io 2 (P Seam) and Plorthern No 3 (J Seam) Pfine <br />Plot apglicable. <br />Pond A <br />1. Not applicable. <br />2. Not applicable <br />3. Not applicable. <br />• 4. Not applicable. <br />5. Plot applicable. <br />6. Not applicable <br />7. Not applicable. <br />8. Not applicable. <br />9. Not applicable. <br />10. Plot applicable. <br />11. Not applicable. <br />12. Not applicable. <br />13. Not applicable <br />Pond B <br />1. Not applicable <br />Both Ponds A and B <br />1 through 8: Response: not applicable. <br />